Cable laying operations in progress until 31 dec by cableship subaro vicinity of trackline joining 10-49.7N…
Sulu Sea · HYDROPAC 3836/13
What this record establishes
Archived notice · 2014-01-01 00:01Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 915/13 090818Z DEC 13.. Issued 2013-12-09 10:14Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Sulu Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
- issued
- 2013-12-09 10:14Z
- status
- Archived notice
- authority
- NAVAREA XI 915/13 090818Z DEC 13.
- NAVAREA
- NAVAREA XI · named as the source of this relay
- sea
- Sulu Sea
- position
- 10.716, 120.721
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
PHILIPPINES. SULU SEA. 1. CABLE LAYING OPERATIONS IN PROGRESS UNTIL 31 DEC BY CABLESHIP SUBARO VICINITY OF TRACKLINE JOINING 10-49.7N 119-31.2E, 10-55.3N 119-39.5E, 10-52.2N 119-44.0E, 10-45.1N 120-19.9E, 10-35.9N 120-44.3E, 10-36.0N 121-21.9E, 10-48.0N 121-56.8E. 2. CANCEL THIS MSG 01 JAN 14.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
34 within 180 nm since 2002 · 2 in the last 12 months · 1 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Pipeline operations in progress until 08 oct by M/V fortitude in vicinity: a. 11-38.23N 118-56.36E2026-09-24
- Submarine pipeline works by M/V fortitude2026-09-24
- Pipeline operations in progress until further notice in vicinity of trackline joining 11-38.57N 118-54.38E…2024-03-18
- Pipeline repairing works2024-03-18
- Cable operations in progress until 11 apr by cableship vega in 10-36.00N 121-22.90E2024-03-15
- Pipeline operations in progress until further notice by M/V skandi hawk in vicinity of trackline joining…2024-02-05
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Submarine pipeline works by M/V fortitudeCable ops · 118.9 nm
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-03 11:00Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.