Underwater cable operations in progress until further notice by cableship pacific guardian in 35-16S 155-25E
Tasman Sea · HYDROPAC 732/02
What this record establishes
Archived notice · 2002-04-25 07:20Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · AUSCOAST 118/02 192135Z APR 02. Issued 2002-04-19 23:15Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Tasman Sea. The parsed report position is -35.267, 155.417. It is a position in the source message, not a live location. Check the original wording for limits and qualifications.
Related notices and cancellation links
- issued
- 2002-04-19 23:15Z
- status
- Archived notice
- authority
- AUSCOAST 118/02 192135Z APR 02
- issued by
- AUSCOAST
- sea
- Tasman Sea
- position
- -35.267, 155.417
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
UNDERWATER CABLE OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY CABLESHIP PACIFIC GUARDIAN IN 35-16S 155-25E. 1.5 MILE BERTH REQUESTED.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
9 within 180 nm since 2000 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations in progress until further notice by cableship ile de brehat along trackline joining…2019-09-12
- Cable operations in progress until further notice by cableship ile de brehat along trackline joining 31-30S…2019-08-07
- Cable operations in progress until further notice by cableship ile de brehat along trackline joining 31-30S…2019-08-07
- Cable laying operations in progress until further notice by cableship ile de re along trackline between…2016-08-19
- Seismic survey in progress until further notice by M/V geo resolution along trackline between 34-51S 155-21E…2015-07-12
- Cable operations in progress until further notice by cableship pacific guardian vicinity 35-16S 155-25E2002-04-25
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-03 14:19Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.