Cable operations in progress until 18 jan by cableship coastal connector along trackline between 09-26.5N…
Caribbean Sea · NAVAREA IV 21/00
What this record establishes
Archived notice · 2000-01-19 06:00Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · COASTAL CONNECTOR PHONE CON 142115Z JAN 00. Issued 2000-01-14 21:40Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Caribbean Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Current notices and reporting history in the Caribbean Sea →
- issued
- 2000-01-14 21:40Z
- status
- Archived notice
- authority
- COASTAL CONNECTOR PHONE CON 142115Z JAN 00
- NAVAREA
- NAVAREA IV
- issued by
- COASTAL CONNECTOR PHONE CON
- sea
- Caribbean Sea
- position
- 9.525, -80.017
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
1. CABLE OPERATIONS IN PROGRESS UNTIL 18 JAN BY CABLESHIP COASTAL CONNECTOR ALONG TRACKLINE BETWEEN 09-26.5N 080-02.0W AND 09-36.5N 080-00.0W. 2. CANCEL THIS MSG 19 JAN.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
26 within 180 nm since 1999 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations 14 jan until further notice by M/V layla within three miles of trackline joining 11-06.60N…2024-01-13
- Cable operations in progress until 10 nov by cableship layla within three miles of trackline joining…2023-11-07
- Cable operations 031000Z thru 10 nov by cableship layla within three miles of trackline joining 09-39.78N…2023-10-31
- Cable operations 16 thru 20 jan by cableship layla in area bound by 11-06.43N 078-36.32W, 11-19.23N…2023-01-15
- Cable operations in progress until 15 jan by cableship layla in area bound by 10-07.27N 080-00.22W,…2023-01-11
- Cable operations in progress until further notice by cableship durable along trackline joining 07-34.40N…2021-03-28
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Starboard hand 4 buoy 09-23.52N 079-53.87W missingNav aids · 10.6 nm
- Port hand 3 buoy 09-23.52N 079-53.75W missingNav aids · 10.7 nm
- Manzanillo entrance west head light 09-22.90N 079-53.90W damagedNav aids · 11.1 nm
- Manzanillo entrance light 09-22.90N 079-53.90W temporarily changed to whiteNav aids · 11.1 nm
- Lm buoy 09-25.99N 079-49.78W missingNav aids · 12.4 nm
Worldwide in the collected sources
22 cable & pipeline work listed in force · see all
Record snapshot 2026-09-25 03:02Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.