Cable operations in progress until further notice by M/V layla in area within three miles of 17-08.26N…
Caribbean Sea · NAVAREA IV 30/24
What this record establishes
Archived notice · 2024-01-09 22:53Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · M/V LAYLA 0/24 090001Z JAN 24.. Issued 2024-01-09 00:26Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Caribbean Sea. The parsed report position is 17.138, -76.087 with a 3.0 nm radius. It is a position in the source message, not a live location. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Cable operations in progress thru 11 jan by M/V layla along trackline joining 17-09.25N 076-03.87W,…later cancellation notice
Current notices and reporting history in the Caribbean Sea →
- issued
- 2024-01-09 00:26Z
- status
- Archived notice
- authority
- M/V LAYLA 0/24 090001Z JAN 24.
- NAVAREA
- NAVAREA IV
- issued by
- M/V LAYLA
- sea
- Caribbean Sea
- position
- 17.138, -76.087 · r 3.0 nm
- vessel
- M/V LAYLA · 88 messages
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
CARIBBEAN SEA. JAMAICA. CABLE OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V LAYLA IN AREA WITHIN THREE MILES OF 17-08.26N 076-05.23W. ONE MILE BERTH REQUESTED.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Within a radius of
- A circular area — every position within a stated distance of a point.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
15 within 180 nm since 2008 · 1 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Underwater operations 05 thru 19 aug by cableship it intrepid in 16-32.79N 075-39.00W2026-08-05
- Cable operations in progress until 12 jan by M/V layla in area bound by 17-00.80N 075-22.50W, 16-55.30N…2024-01-11
- Cable operations in progress until 28 dec by vessel M/V layla in area within 2.5 miles of trackline joining…2023-12-23
- Cable operations in progress until 26 dec by vessel M/V layla in area within 2.5 miles of trackline joining…2023-12-17
- Cable operations 05 thru 15 dec by M/V layla in area within 2.5 miles of trackline joining 13-19.62N…2023-12-04
- Cable operations in progress until 14 dec by M/V layla in area within three miles of trackline joining…2023-11-30
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Portland ridge light 17-44.50N 077-09.50W unlitNav aids · 71.3 nm
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-01 21:00Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.