Pipeline operations in progress until 12 aug by M/V aquamarine along trackline joining 44-18N 038-44E,…
Black Sea · HYDROLANT 1721/13
What this record establishes
Archived notice · 2013-07-19 06:50Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA III 332/13 170708Z JUL 13.. Issued 2013-07-17 09:20Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Black Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
- issued
- 2013-07-17 09:20Z
- status
- Archived notice
- authority
- NAVAREA III 332/13 170708Z JUL 13.
- NAVAREA
- NAVAREA III · named as the source of this relay
- sea
- Black Sea
- position
- 44.147, 39.327
- vessel
- M/V AQUAMARINE · 17 messages
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
BLACK SEA. RUSSIA. 1. PIPELINE OPERATIONS IN PROGRESS UNTIL 12 AUG BY M/V AQUAMARINE ALONG TRACKLINE JOINING 44-18N 038-44E, 43-53N 039-17E, 44-30N 039-53E. WIDE BERTH REQUESTED. 2. CANCEL THIS MSG 13 AUG 13.
Reading this warning
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
47 within 180 nm since 2000 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Pipeline operations in progress until further notice by M/V scandi carla along tracklines between: a.…2018-03-08
- Pipeline operations in progress until further notice by M/V scandi carla along tracklines between: a.…2018-03-05
- Seismic survey 24 aug thru 10 mar 17 by M/V barbaros hayreddin pasa and M/V bravo supporter in area bound by…2016-08-23
- Cable laying operations in progress until 01 jun by M/V jian ji 3001 in area bound by 45-24.63N 036-36.52E,…2016-02-29
- Cable laying operations in progress until 30 sep 16 by M/V jian ji 3001 in area bound by 45-24.4N 036-36.6E,…2015-10-29
- Cable laying operations in progress until 30 sep 16 by M/V jian ji 3001 in area bound by 45-24.47N…2015-10-22
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 15:09Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.