Pipeline operations in progress until further notice by M/V scandi carla along tracklines between: a.…
Black Sea · HYDROLANT 782/18
What this record establishes
Archived notice · 2018-03-08 10:22Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · TURKEY 63/18 051127Z MAR 18.. Issued 2018-03-05 11:40Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Black Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Cancel HYDROLANT 782/18 and this msglater cancellation notice
- issued
- 2018-03-05 11:40Z
- status
- Archived notice
- authority
- TURKEY 63/18 051127Z MAR 18.
- issued by
- TURKEY
- sea
- Black Sea
- position
- 41.832, 37.567
- vessel
- M/V SCANDI CARLA · 2 messages
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
BLACK SEA. TURKEY. DNC 10. PIPELINE OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V SCANDI CARLA ALONG TRACKLINES BETWEEN: A. 42-17.05N 037-24.95E AND 41-22.75N 037-43.00E. B. 42-17.03N 037-25.05E AND 41-22.75N 037-43.02E. WIDE BERTH REQUESTED.
Reading this warning
- DNC (Digital Nautical Chart)
- A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
45 within 180 nm since 2000 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Pipeline operations in progress until further notice by M/V scandi carla along tracklines between: a.…2018-03-08
- Seismic survey 24 aug thru 10 mar 17 by M/V barbaros hayreddin pasa and M/V bravo supporter in area bound by…2016-08-23
- Seismic survey in progress until 15 jan 16 by M/V barbaros hayreddin pasa, M/V bravo supporter and M/V…2015-12-30
- Seismic survey 16 oct thru 30 dec by M/V barbaros hayreddin pasa, M/V bravo supporter and M/V polarfront in…2015-10-14
- Seismic survey 27 jun thru 16 aug by M/V barbaros hayreddin pasa, M/V bravo supporter and M/V deep…2014-06-26
- Seismic survey in progress until 08 sep by M/V polar marquis towing 14 four mile long cables in area bound…2014-06-23
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-09-24 23:45Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.