Cable ops
Seismic survey by M/V ramform vanguard towing 12 7000 meter long cables: a. 11 aug along trackline between…
Western South Atlantic · Uruguay · HYDROLANT 1964/13
- issued
- 2013-08-11 07:29Z
- status
- cancelled 2013-08-13 00:01Z (archive)
- cancels
- HYDROLANT 1945/13HYDROLANT 1954/13
- authority
- NAVAREA VI 359/13 110200Z AUG 13 - COAST GUARD NEWS 101211Z AUG 13.
- sea
- South Atlantic Ocean
- position
- -34.785, -51.888
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
WESTERN SOUTH ATLANTIC.
URUGUAY.
1. SEISMIC SURVEY BY M/V RAMFORM VANGUARD TOWING 12
7000 METER LONG CABLES:
A. 11 AUG ALONG TRACKLINE BETWEEN
34-58.40S 051-28.37W AND 34-28.15S 052-15.43W.
B. 11 AND 12 AUG ALONG TRACKLINE BETWEEN
34-32.08S 052-16.38W AND 35-02.33S 051-29.28W.
C. 12 AUG ALONG TRACKLINE BETWEEN
35-02.48S 051-41.95W AND 34-44.10S 052-10.57W.
NINE MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 1945/13(11,12,13),
VESSEL LOCATED SAFE.
3. CANCEL HYDROLANT 1954/13.
4. CANCEL THIS MSG 13 AUG 13.
This area · cable & pipeline work
503 within 180 nm since 2000 · 0 in the last 12 months · 0 in force now
00
05
10
15
20
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-23
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-35.59S…2020-09-18
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 35-54.40S…2020-09-02
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 36-19.61S…2020-08-23
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-28
- Cable operations in progress until 302300Z sep by cableship ile de brehat in area bound by 34-58.0S…2017-08-16
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- 31 foot S/V austina, white hull, one person on board, unreported cape cod to cape hatterascancels · 2013-08-08
- Seismic survey in progress until 11 aug by M/V ramform vanguard towing 12 7000 meter long cables area bound…cancels · 2013-08-10
- 31 foot S/V austina, white hull, one person on board, unreported cape cod to cape hatterasreplaced · 2013-08-08
- Seismic survey in progress until 11 aug by M/V ramform vanguard towing 12 7000 meter long cables area bound…replaced · 2013-08-10
- Uruguay 1. seismic survey in progress until further notice by M/V ramform vanguard towing 12 7000 meter long…cancelled by · 2013-08-12
Nearby now · within 120 nm
- Radiobeacon at chui light 33-44.6S 053-22.5W off air until 17 jan 27Nav aids · 96.7 nm
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.