Pipeline operations in progress until further notice by barge gmc pride along tracklines between: a.…
Black Sea · HYDROLANT 2044/12
What this record establishes
Archived notice · 2012-09-05 00:12Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA III 360/12 041204Z SEP 12.. Issued 2012-09-04 12:31Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Black Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Pipeline operations in progress until further notice by barge gmc pride along trackline between 45-22.2N…cancelled by this notice
- Distress signal received from S/V rzeszowiak in 61-25N 009-39Wcancelled by this notice
- Distress signal received from S/V rzeszowiak in 61-25N 009-39Wcancelled by this notice
- Pipelaying operations in progress until further notice by barge gmc pride along tracklines between: a.…later cancellation notice
- issued
- 2012-09-04 12:31Z
- status
- Archived notice
- authority
- NAVAREA III 360/12 041204Z SEP 12.
- NAVAREA
- NAVAREA III · named as the source of this relay
- sea
- Black Sea
- position
- 45.524, 31.484
- vessel
- BARGE GMC PRIDE · 12 messages
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
BLACK SEA. UKRAINE. 1. PIPELINE OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY BARGE GMC PRIDE ALONG TRACKLINES BETWEEN: A. 45-22.3N 031-52.4E AND 45-41.0N 031-49.0E. B. 45-40.5N 031-47.8E AND 45-22.2N 030-55.5E. ONE MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2041/12, 2042/12 REFERS. 3. CANCEL HYDROLANT 1944/12.
Reading this warning
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
- Cancellation reference
- A line that cancels an earlier warning by its number, such as CANCEL HYDROLANT 1085/12.
- HYDROLANT
- The U.S. long-range warning series for Atlantic waters outside NAVAREA IV, including the eastern Atlantic, the Mediterranean and adjoining seas.
Collected reports in this area · cable & pipeline work
51 within 180 nm since 1999 · 1 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Pipeline operations in progress until 30 oct in area bound by 43-49.77N 028-37.27E, 43-47.98N 028-37.00E,…2026-09-22
- Cable operations 13 jan thru 10 feb by gsp falcon and gsp antares in area bound by 44-10.50N 030-11.75E,…2023-01-12
- Pipeline operations along tracklines joining: a. 44-25.5N 028-46.9E, 44-25.4N 028-47.5E, 44-28.9N 029-00.9E,…2022-01-17
- Pipeline operations in progress until 31 dec by M/V BIGFOOT-1 in area bound by 44-25.85N 028-46.19E,…2021-01-26
- Pipeline operations 01 jan thru 31 dec 21 by cableship bigfoot in area bound by 44-25.85N 028-46.19E,…2020-12-27
- Underwater operations in progress until 31 dec by cableship bigfoot in area bound by 44-31.89N 028-46.19E,…2020-09-09
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Hazardous operations in progress until further notice in area bound by 45-05N 033-33E, 45-59N 033-51E,…Exercises · 19.6 nm
- War risk area, in northwestern part of black sea to northern of line 45-12.2N 029-41.1E 45-11.5N 029-41.4E…War risk · 33.2 nm
- The coordinator of coastal alerts of ukraine has declared the following coastal approach instructions for…War risk · 42.1 nm
- Ukrainian coastal warning coordinator has declared the following coastal aproach instructions for entry or…Other · 46.6 nm
- Due to mine danger navigation prohibited untill further notice in area bounded by: a 46-04.0N 033-12.8E…Mines · 48.8 nm
- Mining operations in progress until further notice in areas bound by: a. 46-04.0N 033-12.8E, 46-03.1N…Mines · 48.8 nm
- Mining operations in progress until further notice in areas bound by: a. 46-22.50N 030-45.10E, 46-20.20N…Mines · 55.4 nm
- Mines reported in area within five miles of 45-07.10N 030-09.70EMines · 60.9 nm
- 1- neptun alpha production platform has been established at the central coordinate point: 44-02.85N 030-35.25EStructures · 96.5 nm
- Underwater operations 05 jan 25 thru 31 dec 26 in area bound by 44-04.40N 030-34.13E, 44-02.40N 030-30.50E,…Surveys · 100.9 nm
- Object adrift in vicinity 43-55.10N 030-37.65E at 250923Z sepDebris · 103.1 nm
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 14:25Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.