Cable ops
Cable operations 30 aug until further notice by M/V certamen vicinity of trackline joining 38-38.1N…
HYDROLANT 2368/01
- issued
- 2001-08-29 17:38Z
- status
- cancelled 2001-09-06 16:40Z (archive)
- cancels
- HYDROLANT 2278/01HYDROLANT 2233/01
- authority
- MARISCILLA 310/01 291700Z AUG 01; WZ 1797/01 290819Z AUG 01
- sea
- Tyrrhenian Sea
- position
- 38.625, 12.113
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. CABLE OPERATIONS 30 AUG UNTIL FURTHER NOTICE BY M/V CERTAMEN VICINITY OF TRACKLINE JOINING 38-38.1N 011-49.8E, 38-39.0N 012-03.0E, 38-38.3N 012-10.0E, 38-33.5N 012-23.3E. 1000 METER BERTH REQUESTED. 2. CANCEL HYDROLANT 2278/01(37), OPERATIONS COMPLETED. 3. CANCEL HYDROLANT 2233/01.
This area · cable & pipeline work
210 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
23
- Cable operations 28 aug thru 10 sep by cableship cable vigilance in area within one mile of 37-47.30N…2023-08-27
- Pipeline operations in progress until 13 feb 22 by M/V ievoli ivori in area bound by 37-01.0N 011-04.2E,…2021-10-30
- Underwater operations in progress until 152359Z sep by cableship raymond croze in area bound by 38-11.80N…2021-09-05
- Underwater operations 011400Z sep until further notice by cableship raymond croze in area bound by 38-11.80N…2021-08-30
- Cable operations in progress until 14 apr by M/V rebecca along trackline joining 38-56.44N 010-50.23E,…2021-04-05
- Cable operations in progress until 02 may by cableship pierre de fermat: a. along trackline joining…2021-03-31
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Dgps station at point lynas light 53-25N 004-17W at reduced power until 141100Z augcancels · 2001-08-13
- Underwater operations in progress until further notice by M/V goosander vicinity of trackline between 50-21N…cancels · 2001-08-18
- Dgps station at point lynas light 53-25N 004-17W at reduced power until 141100Z augreplaced · 2001-08-13
- Underwater operations in progress until further notice by M/V goosander vicinity of trackline between 50-21N…replaced · 2001-08-18
- Cable laying operations 27 aug until further notice by cableship certamen in area between 37-34.0N 37-29.7N…replaced · 2001-08-24
- Cancel HYDROLANT 2368/01(52,53), 2391/01 and this msgcancelled by · 2001-09-06
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
40 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.