Cable ops
Seismic survey in progress until further notice M/V polarcus asima towing ten 10000 meter long cables in…
Gulf of Guinea · Ghana · HYDROLANT 2939/12
- issued
- 2012-12-13 09:46Z
- status
- cancelled 2013-01-19 14:12Z (archive)
- authority
- NAVAREA II 394/12 130934Z DEC 12.
- position
- 5.426, 1.195
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
GULF OF GUINEA. GHANA. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE M/V POLARCUS ASIMA TOWING TEN 10000 METER LONG CABLES IN AREA BOUND BY 05-46.2N 001-00.2E, 05-04.3N 001-10.5E, 05-05.8N 001-24.5E, 05-49.6N 001-10.3E. WIDE BERTH REQUESTED.
This area · cable & pipeline work
58 within 180 nm since 2003 · 0 in the last 12 months · 0 in force now
03
05
10
15
20
24
- Cable operations until 02 may by cableship ile de sein along trackline joining 04-49.10N 002-51.80E,…2024-04-26
- Cable operations in progress until 02 may by cableship ile de sein along trackline joining 04-49.10N…2024-04-26
- Cable operations in progress until further notice by cableship ile de sein along trackline joining 06-24.00N…2024-03-22
- Cable operations 011200Z nov until further notice by cableship leon thevenin in vicinity 05-30.00N 000-11.00W2023-10-30
- Cable operations 080001Z to 160001Z aug by cableship leon thevenin in area bound by 05-31.00N 000-12.00W,…2022-08-06
- Cable operations 19 thru 25 mar by cableship ile de brehat along trackline joining 06-10.1N 001-21.6E,…2022-03-18
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →