Surveys
Survey operations in progress until further notice by M/V ramform sovereign towing 12 4000 meter long cables…
Eastern South Atlantic · HYDROLANT 3023/18
- issued
- 2018-09-25 11:54Z
- status
- cancelled 2018-12-19 09:56Z (archive)
- cancels
- HYDROLANT 2006/18
- authority
- NAVAREA VII 329/18 250644Z SEP 18.
- position
- -7.833, 12.080
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
EASTERN SOUTH ATLANTIC. DNC 01. 1. SURVEY OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V RAMFORM SOVEREIGN TOWING 12 4000 METER LONG CABLES IN AREA BOUND BY 07-58.16S 012-13.96E, 07-59.47S 012-07.86E, 07-57.73S 012-03.95E, 07-50.24S 012-02.35E, 07-50.21S 011-58.23E, 07-47.89S 011-54.76E, 07-42.47S 011-53.60E, 07-42.55S 012-04.77E, 07-47.94S 012-11.76E. SIX MILE BERTH REQUESTED. 2. CANCEL HYDROLANT 2006/18.
This area · survey operations
70 within 180 nm since 2003 · 1 in the last 12 months · 1 in force now
03
05
10
15
20
25
26
- Survey operations in progress until further notice by M/V ramform victory towing 12 three mile long cables…2026-07-03
- Survey operations in progress until further notice by M/V sw empress towing 7000 meter long cables in area…2023-08-12
- Survey operations 30 mar until further notice by M/V ramform vanguard towing ten 8000 meter long cables in…2023-03-28
- Survey operations in progress until further notice by M/V ramform vanguard towing 14 4500 meter long cables…2023-02-27
- Survey operations in progress until further notice by M/V ramform vanguard towing 12 6500 meter long cables…2023-01-05
- Survey operations in progress until further notice by M/V ramform vanguard towing 12 4050 meter long cables…2022-11-07
Season · when survey operations happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Underwater operations in progress until further notice by M/V ramform sovereign in area bound by 06-00.84S…cancels · 2018-06-21
- Underwater operations in progress until further notice by M/V ramform sovereign in area bound by 06-00.84S…replaced · 2018-06-21
- Survey operations in progress until further notice by M/V ramform sovereign towing 12 4000 meter long cables…cancelled by · 2018-12-19
Nearby now · within 120 nm
Worldwide now
73 survey operations in force · see all
Surveys
Hydrographic and scientific survey vessels, often towing long arrays. All current survey operations →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.