Caution advised
Baltic Sea · HYDROLANT 334/12
What this record establishes
Archived notice · 2012-02-11 10:17Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · LITHUANIA 7/12 092300Z FEB 12.. Issued 2012-02-09 23:45Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Baltic Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
- issued
- 2012-02-09 23:45Z
- status
- Archived notice
- authority
- LITHUANIA 7/12 092300Z FEB 12.
- issued by
- LITHUANIA
- sea
- Baltic Sea
- position
- 55.915, 21.024
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
EASTERN BALTIC SEA. LITHUANIA. CHART 44430 PIPELINE ESTABLISHED, LEAST DEPTH EIGHT METERS, ALONG TRACKLINE BETWEEN 55-54.908N 021-01.474E AND 55-54.905N 021-01.420E. CAUTION ADVISED.
Reading this warning
- Chart reference
- The number of the nautical chart on which the reported position lies.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
Collected reports in this area · cable & pipeline work
6 within 180 nm since 2012 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable laying operations in progress until 30 sep by M/V grand canyon 2 and M/V flintstone along trackline…2015-07-24
- Cable laying operations in progress until 30 sep by M/V grand conyon 2 along trackline beteen 55-47.48N…2015-07-03
- Cable laying operations 07 jul thru 31 aug by M/V maersk lifter along trackline joining 55-37.84N…2014-07-02
- Cable laying operations in progress until further notice by M/V topaz installer along trackline joining…2014-05-09
- Cable laying operations in progress until 15 jul by M/V topaz installer along trackline joining 55-37.84N…2014-04-10
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 03:24Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.