Cable ops
Seismic survey by M/V hawk explorer towing 12000 meter long cables: a. 07 mar along trackline joining…
Brazil-south Coast · HYDROLANT 584/13
- issued
- 2013-03-07 09:02Z
- status
- cancelled 2013-03-09 12:39Z (archive)
- cancels
- HYDROLANT 546/13
- authority
- NAVAREA V S 268/13 070029Z MAR 13.
- position
- -30.160, -48.001
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
BRAZIL-SOUTH COAST.
1. SEISMIC SURVEY BY M/V HAWK EXPLORER TOWING
12000 METER LONG CABLES:
A. 07 MAR ALONG TRACKLINE JOINING
31-51.37S 050-03.28W, 27-51.49S 045-41.48W,
32-43.49S 050-25.39W.
B. 08 THRU 12 MAR ALONG TRACKLINE BETWEEN
27-51.49S 045-41.48W AND 32-43.49S 050-25.39W.
SIX MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 546/13.
3. CANCEL THIS MSG 13 MAR 13.This area · cable & pipeline work
41 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now
99
00
05
10
15
20
- Cable operations in progress until 241100Z feb 21 by cableship peter faber and cableship recorder in: a.…2020-11-26
- Cable operations in progress until 251100Z nov by cableship peter faber and cableship recorder in: a.…2020-09-30
- Underwater operations 15 aug thru 21 sep by cableship peter faber and cableship recorder in: a. 35-38.11S…2020-08-14
- Underwater operations in progress until 20 sep by cableship peter faber and cableship recorder in: a.…2020-08-05
- Underwater operations 040001Z to 152359Z aug by cableship ile de brehat in area bound by 28-14.00S…2017-08-03
- Seismic survey by M/V hawk explorer towing 12000 meter long cables: a. in progress until 08 apr along…2013-04-06
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey by M/V hawk explorer towing 12000 meter long cables: a. 02 mar along trackline joining…cancels · 2013-03-02
- Seismic survey by M/V hawk explorer towing 12000 meter long cables: a. 02 mar along trackline joining…replaced · 2013-03-02
- Seismic survey by M/V hawk explorer towing 12000 meter long cables: a. 09 mar along trackline joining…cancelled by · 2013-03-09
Nearby now · within 120 nm
Worldwide now
38 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.