Cable ops

Seismic survey by M/V hawk explorer towing 12000 meter long cables: a. 07 mar along trackline joining…

Brazil-south Coast · HYDROLANT 584/13

issued
2013-03-07 09:02Z
status
cancelled 2013-03-09 12:39Z (archive)
cancels
HYDROLANT 546/13
authority
NAVAREA V S 268/13 070029Z MAR 13.
position
-30.160, -48.001
source
nga_json · first seen 2026-08-17 13:38Z

Original warning text

BRAZIL-SOUTH COAST.
1. SEISMIC SURVEY BY M/V HAWK EXPLORER TOWING 
   12000 METER LONG CABLES:
   A. 07 MAR ALONG TRACKLINE JOINING
      31-51.37S 050-03.28W, 27-51.49S 045-41.48W,
      32-43.49S 050-25.39W.
   B. 08 THRU 12 MAR ALONG TRACKLINE BETWEEN 
      27-51.49S 045-41.48W AND 32-43.49S 050-25.39W.
   SIX MILE BERTH REQUESTED.
2. CANCEL HYDROLANT 546/13.
3. CANCEL THIS MSG 13 MAR 13.

This area · cable & pipeline work

41 within 180 nm since 1999 · 0 in the last 12 months · 0 in force now

99
00
05
10
15
20

Season · when cable & pipeline work happen here

J
F
M
A
M
J
J
A
S
O
N
D

month of issue, all years in the archive

Timeline

Nearby now · within 120 nm

Worldwide now

38 cable & pipeline work in force · see all

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.