Cable laying operations in progress until further notice by cableship tyco durable in 05-10.3S 146-30.4E
Bismarck Sea · HYDROPAC 1444/09
What this record establishes
Archived notice · 2009-08-29 09:42Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA X 16/09 132253Z AUG 09.. Issued 2009-08-14 02:52Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Bismarck Sea. The parsed report position is -5.172, 146.507. It is a position in the source message, not a live location. Check the original wording for limits and qualifications.
- issued
- 2009-08-14 02:52Z
- status
- Archived notice
- authority
- NAVAREA X 16/09 132253Z AUG 09.
- NAVAREA
- NAVAREA X · named as the source of this relay
- sea
- Bismarck Sea
- position
- -5.172, 146.507
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
CABLE LAYING OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY CABLESHIP TYCO DURABLE IN 05-10.3S 146-30.4E. 2.5 MILE BERTH REQUESTED.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
5 within 180 nm since 2009 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Underwater operations in progress until further notice by cableship teneo in area bound by 05-03.00S…2022-10-28
- Cable operations in progress until further notice by cableship ile de re in area bound by 06-43.34S…2020-05-21
- Cable operations in progress until further notice by cableship ile de re in area bound by 01-26.81S…2020-02-25
- Underwater operations in progress until further notice by cableship teneo in 05-41.95S 147-09.46E2019-07-28
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
24 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 07:48Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.