Cable ops

Cable operations by M/V albatross 5 towing 250 meter long cable: a. 31 jan thru 04 feb along trackline…

Arabian Sea · Lakshadweep · HYDROPAC 215/22

issued
2022-01-26 04:07Z
status
cancelled 2022-03-06 00:01Z (archive)
authority
NAVAREA VIII 59/22 241003Z JAN 22.
position
10.294, 72.869
source
nga_json · first seen 2026-08-17 13:38Z

Original warning text

ARABIAN SEA.
LAKSHADWEEP.
DNC 03.
1. CABLE OPERATIONS BY M/V ALBATROSS 5
   TOWING 250 METER LONG CABLE:
   A. 31 JAN THRU 04 FEB ALONG TRACKLINE JOINING
      11-41.74N 072-42.73E, 11-35.90N 072-11.14E.
   B. 05 THRU 08 FEB ALONG TRACKLINE JOINING
      11-35.90N 072-11.14E, 10-56.71N 072-17.29E.
   C. 09 THRU 13 FEB ALONG TRACKLINE JOINING
      10-56.71N 072-17.29E, 10-51.80N 072-11.57E.
   D. 14 THRU 16 FEB ALONG TRACKLINE JOINING
      10-51.80N 072-11.57E, 11-07.50N 072-43.14E.
   E. 17 THRU 19 FEB ALONG TRACKLINE JOINING
      10-51.80N 072-11.57E, 10-33.63N 072-38.36E.
   F. 20 THRU 22 FEB ALONG TRACKLINE JOINING
      10-33.63N 072-38.36E, 10-04.39N 073-38.57E.
   G. 23 FEB THRU 05 MAR ALONG TRACKLINE JOINING
      10-04.39N 073-38.57E, 08-16.82N 073-03.23E.
   WIDE BERTH REQUESTED.
2. CANCEL THIS MSG 06 MAR 22.

This area · cable & pipeline work

34 within 180 nm since 2002 · 0 in the last 12 months · 0 in force now

02
05
10
15
20
24

Season · when cable & pipeline work happen here

J
F
M
A
M
J
J
A
S
O
N
D

month of issue, all years in the archive

Nearby now · within 120 nm

Nothing else in force within 120 nm.

Worldwide now

35 cable & pipeline work in force · see all

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.