Cable operations are underway until further notice in the Coral Sea by motor vessel Layla, which requests a 2-mile berth along its route.
Coral Sea · HYDROPAC 2798/26
What this record establishes
Cancelled notice · 2026-09-28 16:45Z
This notice disappeared from the issuing source's in-force list. No explicit recovery or all-clear is established by that removal.
- Source and dates
- NGA MSI in-force warnings (DailyMem*.txt). Issued 2026-09-26 22:44Z. First collected 2026-09-28 19:02Z; last seen in collection 2026-09-28 22:32Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Coral Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
- issued
- 2026-09-26 22:44Z
- status
- Cancelled notice
- sea
- Coral Sea
- position
- -17.957, 157.465
- source
- NGA MSI in-force warnings (DailyMem*.txt) · first seen 2026-09-28 19:02Z
Original warning text
CORAL SEA. CABLE OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY M/V LAYLA ALONG TRACKLINE JOINING 14-45.98S 159-08.93E, 15-26.23S 158-28.20E, 17-11.66S 157-52.33E, 20-05.93S 156-46.34E, 20-17.59S 156-01.37E, 20-40.48S 155-22.64E. TWO MILE BERTH REQUESTED.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
4 within 180 nm since 2019 · 1 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations in progress until further notice by cableship ile de re in area bound by 15-20S 157-05E,…2019-11-27
- Cable operations in progress until further notice by cableship ile de re in area bound by 15-20S 157-05E,…2019-11-26
- Cable operations in progress until further notice by cableship ile de brehat along trackline joining 15-06S…2019-07-21
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
25 cable & pipeline work listed in force · see all
Record snapshot 2026-09-28 22:32Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.