Cable ops

Submarine cable operations by the ship Fu Hai are underway in the South China Sea off the Philippines from January 29 until further notice; wide berth requested.

South China Sea · HYDROPAC 334/24

What this record establishes

Cancelled notice · 2026-08-14 18:10Z

This notice disappeared from the issuing source's in-force list. No explicit recovery or all-clear is established by that removal.

Source and dates
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 35/24 281200Z JAN 24.. Issued 2024-01-28 12:31Z. First collected 2026-08-17 13:41Z; last seen in collection 2026-08-17 15:50Z. Collection dates record ingestion, not a new incident or a fresh field observation.
Location covered
South China Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.

Current notices and reporting history in the South China Sea →

issued
2024-01-28 12:31Z
status
Cancelled notice
authority
NAVAREA XI 35/24 281200Z JAN 24.
NAVAREA
NAVAREA XI · named as the source of this relay
sea
South China Sea
position
18.957, 118.374
source
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:41Z

Original warning text

SOUTH CHINA SEA.
PHILIPPINES.
DNC 23.
CABLE OPERATIONS 29 JAN UNTIL FURTHER NOTICE
BY CABLESHIP FU HAI ALONG TRACKLINE JOINING
18-22.26N 116-43.53E, 18-21.25N 116-53.85E,
18-20.66N 116-58.68E, 18-25.18N 117-14.96E,
18-31.21N 117-26.04E, 18-37.15N 117-29.61E,
18-47.35N 117-45.34E, 19-01.64N 118-30.05E,
19-22.36N 119-07.69E, 19-23.43N 119-15.95E,
19-22.61N 119-20.17E, 19-20.32N 119-23.60E,
19-19.10N 119-28.04E, 19-19.58N 119-33.64E,
19-27.50N 120-03.49E.
WIDE BERTH REQUESTED.

Reading this warning

DNC (Digital Nautical Chart)
A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
Cable operations
A ship is laying, burying or repairing a submarine cable, usually along a stated route.
Until further notice
The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
Track line joining
Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
Position (degrees and minutes)
How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
Wide berth requested
Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.

All warning terms →

Collected reports in this area · cable & pipeline work

61 within 180 nm since 1999 · 0 in the last 12 months · 0 listed in force now

99
00
05
10
15
20
24

Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.

Month of issue in the collected archive

J
F
M
A
M
J
J
A
S
O
N
D

All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.

Nearby notices listed in force · within 120 nm

No other collected notice is currently listed in force within this radius. This does not establish safe conditions.

Worldwide in the collected sources

23 cable & pipeline work listed in force · see all

Record snapshot 2026-09-27 03:10Z; source collection times vary.

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work →

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.