Cable operations 292100 sep until further notice by cableship rene descartes along trackline joining 48-02N…
North Atlantic Ocean · HYDROLANT 1841/10
What this record establishes
Archived notice · 2010-10-10 13:03Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA II 369/10 291025Z SEP 10.. Issued 2010-09-29 13:38Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- North Atlantic Ocean. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
Current notices and reporting history in the North Atlantic Ocean →
- issued
- 2010-09-29 13:38Z
- status
- Archived notice
- authority
- NAVAREA II 369/10 291025Z SEP 10.
- NAVAREA
- NAVAREA II · named as the source of this relay
- sea
- North Atlantic Ocean
- position
- 47.551, -11.159
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
CELTIC SEA. CABLE OPERATIONS 292100 SEP UNTIL FURTHER NOTICE BY CABLESHIP RENE DESCARTES ALONG TRACKLINE JOINING 48-02N 009-48W, 47-54N 009-58W, 47-44N 010-16W, 47-33N 010-56W, 47-24N 011-33W, 47-20N 012-36W. WIDE BERTH REQUESTED.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
136 within 180 nm since 1999 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations in progress until further notice by cableship ile de batz in vicinity of trackline joining…2024-09-21
- Cable operations in progress until further notice by cableship decisive in area bound by 48-12.47N…2024-03-08
- Cable operations 26 feb thru 15 mar by cableship decisive in area bound by 48-12.47N 010-29.54W, 48-12.47N…2024-02-23
- Cable operations in progress until further notice by cableship ile d'ouessant in: a. 46-54.36N 010-00.52W2023-10-31
- Cable operations in progress until 102359Z nov by cableship ile d'ouessant in area bound by 46-59.10N…2023-10-25
- Cable operations in progress until 302359Z oct by cableship ile d'ouessant in area bound by 46-59.10N…2023-10-10
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
No other collected notice is currently listed in force within this radius. This does not establish safe conditions.
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-09-24 23:48Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.