Cable ops

Cable operations 30 jan until further notice by cableship it intrepid along trackline joining 35-28.9N…

North Atlantic Ocean · HYDROLANT 242/22

What this record establishes

Archived notice · 2022-01-29 08:54Z

This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.

Source and dates
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA II 37/22 261431Z JAN 22.. Issued 2022-01-26 14:35Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
Location covered
North Atlantic Ocean. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.

Current notices and reporting history in the North Atlantic Ocean →

issued
2022-01-26 14:35Z
status
Archived notice
authority
NAVAREA II 37/22 261431Z JAN 22.
NAVAREA
NAVAREA II · named as the source of this relay
sea
North Atlantic Ocean
position
34.637, -9.505
source
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z

Original warning text

EASTERN NORTH ATLANTIC.
MOROCCO.
DNC 08.
CABLE OPERATIONS 30 JAN UNTIL FURTHER NOTICE
BY CABLESHIP IT INTREPID ALONG TRACKLINE JOINING
35-28.9N 011-24.4W, 35-25.6N 011-01.5W,
35-14.7N 010-45.3W, 34-54.9N 010-07.6W,
34-48.9N 009-36.5W, 34-19.9N 008-50.8W,
33-36.5N 007-40.4W.
WIDE BERTH REQUESTED.

Reading this warning

DNC (Digital Nautical Chart)
A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
Cable operations
A ship is laying, burying or repairing a submarine cable, usually along a stated route.
Until further notice
The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
Track line joining
Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
Position (degrees and minutes)
How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
Wide berth requested
Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.

All warning terms →

Collected reports in this area · cable & pipeline work

119 within 180 nm since 1998 · 0 in the last 12 months · 0 listed in force now

98
00
05
10
15
20
22

Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.

Month of issue in the collected archive

J
F
M
A
M
J
J
A
S
O
N
D

All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.

Nearby notices listed in force · within 120 nm

Worldwide in the collected sources

25 cable & pipeline work listed in force · see all

Record snapshot 2026-09-29 23:55Z; source collection times vary.

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work →

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.