Cable operations 21 aug thru 09 sep by cableship idle de sein along trackline joining 06-54.4S 112-30.4E,…
Java Sea · HYDROPAC 1586/06
What this record establishes
Archived notice · 2006-09-01 01:27Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA XI 363/06 181200Z AUG 06.. Issued 2006-08-18 19:34Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Java Sea. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Submarine cable operations 01 thru 30 sep by cableship ile de sein along trackline joining 03-52.6S…later cancellation notice
- issued
- 2006-08-18 19:34Z
- status
- Archived notice
- authority
- NAVAREA XI 363/06 181200Z AUG 06.
- NAVAREA
- NAVAREA XI · named as the source of this relay
- sea
- Java Sea
- position
- -5.374, 113.516
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
1. CABLE OPERATIONS 21 AUG THRU 09 SEP BY CABLESHIP IDLE DE SEIN ALONG TRACKLINE JOINING 06-54.4S 112-30.4E, 06-47.8S 112-30.2E, 06-43.8S 112-30.7E, 06-21.7S 112-39.3E, 05-39.0S 113-25.6E, 05-24.4S 113-37.6E, 04-00.3S 114-23.9E, 03-54.1S 114-31.5E, 03-52.7S 114-36.6E. 2. CANCEL THIS MSG 10 SEP.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
21 within 180 nm since 2001 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations 27 oct until further notice by cableship ile de re in vicinity of trackline joining…2023-10-26
- Cable operations 08 thru 23 sep by cableship rene descartes along trackline joining 04-04.40S 115-40.80E,…2022-09-07
- Cable operations 07 mar thru 07 apr by cableship ile de re in vicinity of trackline joining 06-53S 113-07E,…2018-03-06
- Cable operations 06 feb thru 21 mar by cableship ile de re in vicinity of trackline joining 05-04S 117-27E,…2018-02-04
- Seismic survey in progress until 15 feb 14 by M/V cgg amadeus towing eight 6000 meter long cables in area…2013-12-28
- Seismic survey in progress until 30 jul by M/V nordic energy towing 4500 meter long cable in area bound by…2011-07-15
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Sunken wreck, exists in 04-32-31.8S 114-01-36.0EWrecks · 58.5 nm
- Sunken wreck, exists in 04-14-42S 113-44-18EWrecks · 69.1 nm
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-03 00:44Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.