Cable laying operations in progress until further notice by cableship niwa along trackline joining 28-24.07N…
Persian Gulf · HYDROPAC 2392/11
What this record establishes
Archived notice · 2011-10-29 00:00Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA IX 367/11 250634Z AUG 11.. Issued 2011-08-25 07:36Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Persian Gulf. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
Related notices and cancellation links
- Cancel HYDROPAC 2392/11 and this msg, operations completedlater cancellation notice
- issued
- 2011-08-25 07:36Z
- status
- Archived notice
- authority
- NAVAREA IX 367/11 250634Z AUG 11.
- NAVAREA
- NAVAREA IX · named as the source of this relay
- sea
- Persian Gulf
- position
- 26.675, 53.950
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
PERSIAN GULF. GULF OF OMAN. CABLE LAYING OPERATIONS IN PROGRESS UNTIL FURTHER NOTICE BY CABLESHIP NIWA ALONG TRACKLINE JOINING 28-24.07N 050-32.41E, 27-20.15N 051-23.72E, 26-53.95N 052-24.17E, 26-34.42N 053-00.81E, 26-12.82N 054-08.07E, 26-23.83N 055-49.25E, 26-38.31N 056-38.01E, 25-13.31N 056-48.65E. ONE MILE BERTH REQUESTED.
Reading this warning
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Until further notice
- The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
Collected reports in this area · cable & pipeline work
179 within 180 nm since 1998 · 8 in the last 12 months · 2 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Pipeline operations 19 sep thru 02 oct2026-09-18
- Pipeline operations 18 sep until further notice by barge mc dermott in area bound by 25-59.10N 051-36.60E,…2026-09-17
- Pipeline operations 10 aug thru 10 nov by vessel barge derrick barge 30 in area bound by 26-31.70N…2026-08-09
- Pipeline operations 05 thru 30 apr by derrick barge 32 in area bound by 26-04.97N 051-32.09E, 26-03.90N…2026-04-04
- Cable operations in progress until further notice along trackline joining 25-57.40N 051-32.81E, 25-58.72N…2026-02-18
- Pipeline operations 02 dec thru 15 jan 26 by derrick barge 30 in area bound by 26-23.52N 052-13.83E,…2025-12-01
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Partially submerged wreck in vicinity 25-11.64N 054-10.12EWrecks · 89.7 nm
- Anchoring prohibited in area bound by 25-26.59N 055-05.88E, 25-28.17N 055-06.69E, 25-28.32N 055-09.15E,…Other · 98 nm
- Zaqqum buoy in 25-06.56N 053-25.06ENav aids · 98.3 nm
- Pipeline operations 10 aug thru 10 nov by vessel barge derrick barge 30 in area bound by 26-31.70N…Cable ops · 100.9 nm
- Wave rider buoy, fl 5 y 10 sec, temporarily established in 26-39.57N 051-57.22ENav aids · 107.1 nm
- Underwater operations in progress until further notice by M/V HYSY289 in area bound by 26-41.99N 051-53.26E,…Surveys · 107.3 nm
- Bh jacket light fl(r) 4 sec temporarily established in 26-38.41N 051-56.90ENav aids · 107.4 nm
- Foul ground, anchor with 2.5 shackle chain reported in 25-07.69N 052-53.09EWrecks · 109.3 nm
- Survey operations in progress until further notice by M/V halul 41 in area bound by 26-23.34N 051-47.10E,…Surveys · 114.8 nm
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 16:58Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.