Cable laying operations in progress until 30 sep by cableship maram along tracklines joining: a. 29-01.07N…
Persian Gulf · HYDROPAC 2658/16
What this record establishes
Archived notice · 2016-10-01 00:01Z
This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.
- Source and dates
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · NAVAREA IX 318/16 022358Z SEP 16.. Issued 2016-09-03 00:12Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
- Location covered
- Persian Gulf. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.
- issued
- 2016-09-03 00:12Z
- status
- Archived notice
- authority
- NAVAREA IX 318/16 022358Z SEP 16.
- NAVAREA
- NAVAREA IX · named as the source of this relay
- sea
- Persian Gulf
- position
- 29.019, 48.184
- source
- NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z
Original warning text
PERSIAN GULF.
KUWAIT.
DNC 10.
1. CABLE LAYING OPERATIONS IN PROGRESS UNTIL 30 SEP
BY CABLESHIP MARAM ALONG TRACKLINES JOINING:
A. 29-01.07N 048-09.53E, 29-01.07N 048-09.57E,
29-01.11N 048-09.87E, 29-01.20N 048-10.09E,
29-01.21N 048-10.12E, 29-01.22N 048-10.15E,
29-01.27N 048-10.29E, 29-01.31N 048-10.38E,
29-01.67N 048-11.43E, 29-01.79N 048-12.01E,
29-01.79N 048-12.19E, 29-01.73N 048-12.29E.
B. 29-00.48N 048-09.69E, 29-00.49N 048-09.77E,
29-00.59N 048-10.42E, 29-00.60N 048-10.48E,
29-00.95N 048-11.91E, 29-01.12N 048-12.13E,
29-01.14N 048-12.15E, 29-01.15N 048-12.16E,
29-01.17N 048-12.19E, 29-01.32N 048-12.39E,
29-01.47N 048-12.45E, 29-01.53N 048-12.43E.
WIDE BERTH REQUESTED.
2. CANCEL THIS MSG 01 OCT 16.
Reading this warning
- DNC (Digital Nautical Chart)
- A reference to one of the regions of NGA's Digital Nautical Chart, used to tell the reader which charts a warning affects.
- Cable operations
- A ship is laying, burying or repairing a submarine cable, usually along a stated route.
- Track line joining
- Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
- Position (degrees and minutes)
- How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
- Wide berth requested
- Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.
- CANCEL THIS MSG
- The warning's own expiry: a line telling the reader when the message cancels itself.
Collected reports in this area · cable & pipeline work
48 within 180 nm since 1999 · 0 in the last 12 months · 0 listed in force now
Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.
- Cable operations in progress until further notice in vicinity 29-19.68N 048-06.18E2023-09-11
- Pipeline operations in progress until 30 sep along trackline joining 28-24.86N 048-32.30E, 28-26.09N…2020-08-18
- Pipeline operations in progress until further notice along trackline joining 28-43.16N 048-22.83E, 28-42.39N…2017-08-09
- Cable repair operations 25 jan until further notice by cableship etisalat in: a. 29-43.24N 048-40.40E2017-01-24
- Seismic survey in progress until 03 sep by M/V gulf horizon, M/V dean andrew, M/V theresa, M/V samaritan,…2014-06-03
- Seismic survey in progress until 31 jul by M/V gulf horizon, M/V dean andrew, M/V theresa, M/V samaritan,…2014-05-01
Month of issue in the collected archive
All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.
Nearby notices listed in force · within 120 nm
- Survey operations 10 aug until further notice by M/V vision 2 in: a. 29-03.09N 048-10.06ESurveys · 1.4 nm
- Dangerous wreck marked by buoy in 29-05.49N 048-22.09EWrecks · 10.6 nm
- Navigation prohibited until further notice in area within 600 meters of 28-52.49N 048-21.63ERestricted · 12.7 nm
- Met tower 28-46.0N 048-26.1E temporarily replaced by yellow buoy, FL(4) 15 sec 5MOther · 20.1 nm
- Barge dream 1 sank in 29-14.06N 048-41.22EWrecks · 29.4 nm
- Navigation prohibited until further notice in area within 600 meters of 29-13.10N 048-44.42ERestricted · 31.5 nm
Worldwide in the collected sources
23 cable & pipeline work listed in force · see all
Record snapshot 2026-10-02 19:01Z; source collection times vary.
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.