Cable ops

Seismic survey in progress until further notice by M/V markab along trackline between 38-38S 142-55E and…

Great Australian Bight · HYDROPAC 47/04

What this record establishes

Archived notice · 2004-01-25 01:49Z

This notice comes from the historical archive. Its archived status does not establish when or how the reported situation ended.

Source and dates
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · AUSCOAST 4/04 POR EGC#316 110941Z JAN 04. Issued 2004-01-11 10:09Z. First collected 2026-08-17 13:38Z; last seen in collection 2026-08-17 15:46Z. Collection dates record ingestion, not a new incident or a fresh field observation.
Location covered
Great Australian Bight. The map shows the reported line or operation extent; it is not a vessel track. Check the original wording for limits and qualifications.

Related notices and cancellation links

Current notices and reporting history in the Great Australian Bight →

issued
2004-01-11 10:09Z
status
Archived notice
authority
AUSCOAST 4/04 POR EGC#316 110941Z JAN 04
issued by
AUSCOAST
sea
Great Australian Bight
position
-38.875, 142.917
vessel
M/V MARKAB · 44 messages
source
NGA MSI broadcast-warn JSON (archive, frozen 2024-05) · first seen 2026-08-17 13:38Z

Original warning text

SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE
BY M/V MARKAB ALONG TRACKLINE BETWEEN
38-38S 142-55E AND 39-07S 142-55E.
2.5 MILE BERTH REQUESTED.

Reading this warning

Seismic survey
A survey that maps the rock beneath the seabed with sound pulses from air guns, recorded on streamers kilometres long.
Until further notice
The operation or danger has no scheduled end; the warning stays in force until a later message cancels it.
Track line joining
Introduces a route through a series of positions — a cable route, a tow's track or a survey line.
Position (degrees and minutes)
How warnings write positions: degrees, a hyphen, then minutes, with N/S and E/W — 49-40.8N 003-43.8W.
Wide berth requested
Keep well clear — or, when a distance is given ("TWO MILE BERTH REQUESTED"), at least that far away.

All warning terms →

Collected reports in this area · cable & pipeline work

18 within 180 nm since 2000 · 3 in the last 12 months · 1 listed in force now

00
05
10
15
20
25
26

Counts include repeat notices about the same situation. NGA archive coverage ends 2024-05; live collection began 2026-08-17. The period between them is incomplete. An empty year is not evidence that no hazards occurred.

Month of issue in the collected archive

J
F
M
A
M
J
J
A
S
O
N
D

All available years combined. Uneven collection and repeat bulletins affect these counts; this chart does not measure the seasonality or probability of incidents.

Nearby notices listed in force · within 120 nm

Worldwide in the collected sources

23 cable & pipeline work listed in force · see all

Record snapshot 2026-10-03 18:36Z; source collection times vary.

Cable ops

Cable laying, pipeline and seismic operations. All current cable & pipeline work →

Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.