Cable ops
Seismic survey in progress until further notice by M/V cgg harmattan towing six 6500 meter long cables in…
HYDROPAC 686/07
- issued
- 2007-04-17 08:52Z
- status
- cancelled 2007-10-06 04:16Z (archive)
- cancels
- HYDROPAC 422/07HYDROPAC 679/07
- authority
- SPOCC 170500Z APR 07; AUSCOAST 41/07 CX; AUSCOAST 68/07 CX.
- position
- 10.941, 109.865
- source
- nga_json · first seen 2026-08-17 13:38Z
Original warning text
1. SEISMIC SURVEY IN PROGRESS UNTIL FURTHER NOTICE BY
M/V CGG HARMATTAN TOWING SIX 6500 METER LONG
CABLES IN AREAS BOUND BY:
A. 11-27.55N 109-37.43E, 11-04.07N 109-37.22E,
11-03.39N 109-50.50E, 11-28.04N 109-50.36E.
B. 10-55.43N 109-49.12E, 10-30.39N 109-48.33E,
10-30.19N 110-06.35E, 10-55.30N 110-06.44E.
WIDE BERTH REQUESTED.
2. CANCEL HYDROPAC 422/07(74), SURVEY COMPLETED.
3. CANCEL HYDROPAC 679/07(75), AID RESTORED.
This area · cable & pipeline work
69 within 180 nm since 2001 · 0 in the last 12 months · 0 in force now
01
05
10
15
20
- Pipeline operations 10 jun thru 31 oct by M/V nile river in vicinity of trackline joining 10-22.2N…2020-06-05
- Pipeline operations in progress until 11 sep by M/V nile river in vicinity of trackline joining 10-22.19N…2020-03-30
- Cable operations in progress until 31 dec 19 by cableship responders along trackline joining 13-44.90N…2019-11-28
- Survey and pipeline operations in progress until 15 oct by M/V ptsc thang long along trackline joining…2019-04-18
- Cable operations 19 thru 28 sep by cableship lodbrog in vicinity 09-02.6N 108-18.9E2017-09-17
- Cable repair operations in progress until 07 feb by cableship cable retriever in area bound by 09-46.5N…2017-01-25
Season · when cable & pipeline work happen here
J
F
M
A
M
J
J
A
S
O
N
D
month of issue, all years in the archive
Timeline
- Seismic survey in progress until further notice by M/V veritas voyager towing four two mile long cables in…cancels · 2007-03-08
- RACON at troubridge hill light 35-10.0S 137-38.5E unreliablecancels · 2007-04-16
- Seismic survey in progress until further notice by M/V veritas voyager towing four two mile long cables in…replaced · 2007-03-08
- RACON at troubridge hill light 35-10.0S 137-38.5E unreliablereplaced · 2007-04-16
- Seismic survey in progress until further notice by M/V cgg harmattan towing six 6500 meter long cables in…cancelled by · 2007-10-06
Nearby now · within 120 nm
Nothing else in force within 120 nm.
Worldwide now
35 cable & pipeline work in force · see all
Cable ops
Cable laying, pipeline and seismic operations. All current cable & pipeline work →
Not for navigation. This is a re-rendering of an official navigational warning for awareness; mariners must use official NAVAREA broadcasts and their national MSI service.